Ecovision Solar installations, Monitoring and Maintenance

South Western Ambulance Service NHS Foundation Trust (SWASFT)

ENQUIRIES 01453 796790
9 am - 5.00 pm Monday - Friday

Ecovision partnered with South Western Ambulance Service NHS Foundation Trust (SWASFT) to deliver a large-scale solar PV rollout across four units at their headquarters site. The aim was to significantly reduce energy costs and carbon emissions while maintaining critical operational continuity in this highly sensitive environment.

System details

  • Unit 1 & 2: 67 kWp
  • Unit 3 & 4: 108 kWp
  • Unit 7: 28 kWp (including removal of an existing system)
  • Unit 8: 27.5 kWp (including removal of an old system)

Solar PV installations across multiple units

Cabling and aesthetics

Most of the cabling was routed discreetly beneath the solar panels. The final connection runs posed challenges due to roof overhangs and external brickwork. SWASFT preferred external cabling; however, we ensured all external runs were kept tidy and visually unobtrusive to maintain the building’s appearance.

Noise mitigation

Given that part of the site operates as a critical call centre, it was imperative to minimise noise disruption during installation. On the first day, noise tests were carried out to confirm levels were acceptable and would not interfere with vital life-saving calls. The project team maintained this standard throughout, ensuring operations continued seamlessly.

Parking and site access

The headquarters is a busy site with limited parking availability. Throughout the project, careful logistics planning ensured minimal disruption to staff and visitors. No major areas were blocked, and parking remained largely available despite the equipment and delivery requirements.

Scaffolding and aerial interference

Units 3 & 4 presented additional complexities due to aerials used as an emergency fallback communication system. It was essential that scaffolding poles remained at least 250 mm away from these aerials. After scaffolding installation, the Trust conducted testing to ensure no negative impact on their communication systems.

An emergency plan was also put in place to vacate workers from the roof in the event that the aerials needed to be activated. While this plan was ultimately not needed, it demonstrated the robust risk management approach taken.

Fire safety integration

At Unit 3 & 4, due to the nature of work in the building and a “stay put” fire policy, we coordinated closely with the fire alarm contractor to install a fire wire detection system underneath the solar panels. This extra layer of safety was critical in ensuring compliance and protecting building occupants.

System replacements

  • Unit 7 and Unit 8: Both units required the removal and decommissioning of old solar systems prior to the installation of the new, higher-efficiency PV arrays.

Project outcomes

  • Total capacity installed: ~230 kWp
  • Carbon savings and substantial reduction in energy costs
  • Minimal operational disruption despite a highly sensitive working environment
  • Improved site resilience through updated systems and additional safety measures

Collaboration

Regular and routine project meetings were held between Ecovision and the SWASFT project team. This transparent and proactive communication was vital in addressing challenges, maintaining operational continuity, and achieving a smooth delivery across all units.

The SWASFT solar PV rollout exemplifies how thoughtful planning, close stakeholder engagement, and engineering expertise can deliver sustainable energy solutions even in complex, critical environments.

 

Ecovision case studies

Ecovision Asset Management
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.